A case study of an Intelligent Manufacturing Control based on multi-agents' system to deal with batching and sequencing on rework context.

Authors
  • ZIMMERMANN Emmanuel
  • HAOUZI Hind
  • THOMAS Philippe
  • PANNEQUIN Remi
  • NOYEL Melanie
  • THOMAS Andre
Publication date
2017
Publication type
Proceedings Article
Summary Nowadays complex control systems are rising and especially hybrid control architectures which are developed to face the manufacturing control challenges that occur with the last industrial revolution and the emerging of industry 4.0. This work presents an application, on a testing platform, of a scheduling algorithm, with multi-criteria objectives, developed for Acta-Mobilier company suffering from high rework rate. This algorithm will inscribe itself in a hybrid control system based on smart entities. The main objective is to validate the contribution of the proposed algorithm in a disturbed environment. The platform, implemented with a multi-agent's system, allows to measure the reliability of the proposed algorithm used on a complex system in the particular case of high rework rate.
Topics of the publication
  • ...
  • No themes identified
Themes detected by scanR from retrieved publications. For more information, see https://scanr.enseignementsup-recherche.gouv.fr